Well, I had this drafted up not long after
1. Finish and mail the Snape Birthday Project - Currently 85% done
2. Finish and mail bonzaibetz's Molly Sweater from the LoveforLily auction - status 3/4 done
3. Plan, make and mail Reducio Swap #18
4. Complete Stephanie's Christmas gift by May 1 - status designed and plotted
5. Complete Eileen's Christmas gift by May 1 - status 1/8th done
6. Complete Charissa's Christmas gift by May 1
7. Finish my Christmas Gingerbread Shawl - status 1/2 done
8. Make 6 Prayer Shawls
9. Make 3 Lapghans for prayer shawl group
10. Make 2 granny ghans for The Linus Connection
11. Assemble and border Sir Dragon Preacher's afghan - status 24 blocks waiting to be joined
12. Teach myself entrelac knitting and make a shawl
No comments:
Post a Comment